top of page
The concrete skate park in Kemijärvi, designed by Playground

PLANNING

Planning: needs assessment, participatory design and reference plan

Reference plan or participatory plan?

When a municipality needs a new recreational environment, the first question is where the design should start. In a municipal construction project, the first stage is a needs assessment, which sets out the justification for the need, the objectives and the preconditions. A reference plan provides the content for this: after it, the client knows what is worth building, for whom, how much space is needed and what size of project is being discussed. A participatory plan is drawn up together with the future users once the site and the space are already known; the client then has a plan made with the users and the material for putting the construction out to tender.

Understanding

The client does not need to know the sport or the construction it requires.

Involvement

Users are involved before the most important design decisions are made.

Decision-making

FOR MUNICIPALITIES AND PROCUREMENT

For municipalities, cities and tourism resorts.

From a council motion to a project plan, investment decision and tender – or directly to design-and-build, a main contract, KVR delivery and maintenance.

Can a reference plan be procured as a small-value procurement?

Often yes, in line with the municipality’s guidelines for small-value procurement. For example, Rovaniemi procured the design of a skate area from us as a direct award.

Tender boundary: We design concrete and asphalt sites; the client puts the construction out to tender.

CPV: 71222000 · 71420000 · 71320000 · 45112720 · 45236000 · 37535200

Eligibility: Arctic Playground Solutions Oy, Business ID 2749714-1. Contractor’s liability obligations and insurance are reviewed project by project according to the sector. A good credit rating for more than 10 years.

Direct contact: On a call, we can often quickly work out whether you first need a reference plan, a direct construction quote or a more detailed discussion.
Contact person: Jaakko · jaakko@playgroundsolutions.fi · +358 44 289 45 95

WHICH ONE SUITS · PARTICIPATORY DESIGN

Choose the starting point according to the stage of the project.

When needed, enthusiasts, young people, families, clubs and local communities are brought in already at the first stage – while they can still genuinely influence the content of the area. The two approaches can also be combined, so involvement immediately guides the scope and content of the reference plan. Playground works between the users and the client, turning experiences, wishes and sport-specific needs into solutions that can be built – creating a place that users can make their own.

REFERENCE PLAN

When the need is known, but the solution is not

Suitable when the scope, users, space requirements or location are still open. Serves as the basis for a needs assessment before the final solution is fixed.

PARTICIPATORY PLAN

When the site and the space are known

Suitable when the location has been decided and the content is designed with the users. Especially for sites aimed at young people – such as skate parks and local sports facilities (skateboarding, scootering, BMX, roller skating, pump track and street art) – the structures and art are designed from users’ own wishes.

HOW IT PROGRESSES

Participatory design in four stages. Creative work is part of the method.

STAGE 1

Survey

Together with the client, we go through the space, its intended use, the target groups, existing recreational facilities and the constraints.

STAGE 2

Involvement and creative work

When needed, we collect wishes as drawings, as people’s own plans, through online discussion and on site. At the same time we gather ideas for the look of the place and its art.

STAGE 3

Reference plan

We assess the wishes in relation to the space, safety and the user groups, and design the structures and the art as one whole.

STAGE 4

Construction

We can also build timber structures. We take on design-and-build contracts and are glad to join main contracts and KVR contracts.

WHERE

Reference planning works in different active leisure environments.

The same approach can be used for skate parks, mountain biking, snow areas, water tourism and other special sites. The content and the user groups to be involved depend on the site.

FOR WHEELED SPORTS

Skate parks and other rideable environments

We map the area’s enthusiasts, user levels and existing facilities. When needed, users are involved in the design, after which the client can be shown the area required, the content, the preliminary design language and the cost level.

FOR MOUNTAIN BIKING

Bike parks and built cycling areas

Reference planning can define a bike park’s user groups and difficulty levels, as well as the start gates, signage, maps and other special structures required, before detailed design.

FOR SNOW SITES

Snowparks, children’s areas and experience trails

A ski resort can get an overall picture of what kind of area serves its customers, how much space and snow the project requires, and how the whole connects with the resort’s other operations.

FOR WATER AND SPECIAL SITES

A new service can first be made visible.

When a client is planning a completely new activity, a reference plan helps to outline the service’s space requirements, users, structures, cost level and day-to-day operation before moving on to the actual design.

WHAT YOU GET

A basis for the needs assessment: the client sees the whole before the actual design.

Depending on the site, the material includes a plan for the use of the area, the layout of functions, visualisations, dimensions and a preliminary cost estimate.

After this, the client has a sufficient understanding of the whole to start the actual design. The material can be used as the basis for the municipality’s needs assessment, in preparing the project plan, and as supporting material for grant and project funding applications and procurement, which require a justification, draft plans and a cost estimate.

For a concrete skate park, the next stage is the actual design work, in which Playground produces the design, structural and section drawings needed to put the construction out to tender.

With a participatory plan, the client also receives a summary of the involvement: the channels, the numbers of participants and how the key wishes are reflected in the plan.

REFERENCE · ROVANIEMI

Suosiolantie 5: participatory design of a skate hall

The City of Rovaniemi’s youth services commissioned Playground to design the skate area of an active youth facility. A modular skate park of about 370 m² for skateboarding, scootering and BMX riding was designed for a space of about 670 m².

The channels for involvement were a web page, Instagram, a WhatsApp community and a live event held at Suosiolantie. The wishes were assessed in relation to the space, the purpose of the youth facility and shared use by different user groups. The result was a construction plan with visualisations and dimensioned drawings for putting the construction out to tender.

SUOSIOLANTIE IN NUMBERS

Hundreds of ideas as the basis for the design.

60+

drawings from pupils in grades 4–6

10+

plans of their own from adult enthusiasts

30+

active skateboarders in the discussion about the hall’s content

500+

messages in the WhatsApp community discussion

Draft plans on display for participants to vote on

Draft plans were on display for the participants, who voted on which direction the design should take.

Jaakko Tossavainen presenting the plan to participants

Participatory design together: Jaakko Tossavainen presented the plan and made changes in real time according to the participants’ wishes.

Participants’ drawings on the walls

Participants’ drawings on the walls.

A participant’s drawing of the skate park they would like, Suosiolantie (drawing 1)
A participant’s drawing of the skate park they would like, Suosiolantie (drawing 2)
A participant’s drawing of the skate park they would like, Suosiolantie (drawing 3)
A participant’s drawing of the skate park they would like, Suosiolantie (drawing 4)

Participants’ drawings from the design of the Suosiolantie skate hall.

Base drawings from the involvement stage (ZIP)

NEXT STEP

All you need to start is the need for a better recreational place.

You do not need a finished plan, a budget or even a final location. The job of reference planning is to work out the things the client does not yet know.

bottom of page