PLANNING
When a municipality needs a new recreational environment, the first question is where the design should start. In a municipal construction project, the first stage is a needs assessment, which sets out the justification for the need, the objectives and the preconditions. A reference plan provides the content for this: after it, the client knows what is worth building, for whom, how much space is needed and what size of project is being discussed. A participatory plan is drawn up together with the future users once the site and the space are already known; the client then has a plan made with the users and the material for putting the construction out to tender.
The client does not need to know the sport or the construction it requires.
Users are involved before the most important design decisions are made.
FOR MUNICIPALITIES AND PROCUREMENT
From a council motion to a project plan, investment decision and tender – or directly to design-and-build, a main contract, KVR delivery and maintenance.
Often yes, in line with the municipality’s guidelines for small-value procurement. For example, Rovaniemi procured the design of a skate area from us as a direct award.
Tender boundary: We design concrete and asphalt sites; the client puts the construction out to tender.
CPV: 71222000 · 71420000 · 71320000 · 45112720 · 45236000 · 37535200
Eligibility: Arctic Playground Solutions Oy, Business ID 2749714-1. Contractor’s liability obligations and insurance are reviewed project by project according to the sector. A good credit rating for more than 10 years.
Direct contact: On a call, we can often quickly work out whether you first need a reference plan, a direct construction quote or a more detailed discussion.
Contact person: Jaakko · jaakko@playgroundsolutions.fi · +358 44 289 45 95
WHICH ONE SUITS · PARTICIPATORY DESIGN
When needed, enthusiasts, young people, families, clubs and local communities are brought in already at the first stage – while they can still genuinely influence the content of the area. The two approaches can also be combined, so involvement immediately guides the scope and content of the reference plan. Playground works between the users and the client, turning experiences, wishes and sport-specific needs into solutions that can be built – creating a place that users can make their own.
REFERENCE PLAN
Suitable when the scope, users, space requirements or location are still open. Serves as the basis for a needs assessment before the final solution is fixed.
PARTICIPATORY PLAN
Suitable when the location has been decided and the content is designed with the users. Especially for sites aimed at young people – such as skate parks and local sports facilities (skateboarding, scootering, BMX, roller skating, pump track and street art) – the structures and art are designed from users’ own wishes.
HOW IT PROGRESSES
STAGE 1
Together with the client, we go through the space, its intended use, the target groups, existing recreational facilities and the constraints.
STAGE 2
When needed, we collect wishes as drawings, as people’s own plans, through online discussion and on site. At the same time we gather ideas for the look of the place and its art.
STAGE 3
We assess the wishes in relation to the space, safety and the user groups, and design the structures and the art as one whole.
STAGE 4
We can also build timber structures. We take on design-and-build contracts and are glad to join main contracts and KVR contracts.
WHERE
The same approach can be used for skate parks, mountain biking, snow areas, water tourism and other special sites. The content and the user groups to be involved depend on the site.
FOR WHEELED SPORTS
We map the area’s enthusiasts, user levels and existing facilities. When needed, users are involved in the design, after which the client can be shown the area required, the content, the preliminary design language and the cost level.
FOR MOUNTAIN BIKING
Reference planning can define a bike park’s user groups and difficulty levels, as well as the start gates, signage, maps and other special structures required, before detailed design.
FOR SNOW SITES
A ski resort can get an overall picture of what kind of area serves its customers, how much space and snow the project requires, and how the whole connects with the resort’s other operations.
FOR WATER AND SPECIAL SITES
When a client is planning a completely new activity, a reference plan helps to outline the service’s space requirements, users, structures, cost level and day-to-day operation before moving on to the actual design.
WHAT YOU GET
Depending on the site, the material includes a plan for the use of the area, the layout of functions, visualisations, dimensions and a preliminary cost estimate.
After this, the client has a sufficient understanding of the whole to start the actual design. The material can be used as the basis for the municipality’s needs assessment, in preparing the project plan, and as supporting material for grant and project funding applications and procurement, which require a justification, draft plans and a cost estimate.
For a concrete skate park, the next stage is the actual design work, in which Playground produces the design, structural and section drawings needed to put the construction out to tender.
With a participatory plan, the client also receives a summary of the involvement: the channels, the numbers of participants and how the key wishes are reflected in the plan.
REFERENCE · ROVANIEMI
The City of Rovaniemi’s youth services commissioned Playground to design the skate area of an active youth facility. A modular skate park of about 370 m² for skateboarding, scootering and BMX riding was designed for a space of about 670 m².
The channels for involvement were a web page, Instagram, a WhatsApp community and a live event held at Suosiolantie. The wishes were assessed in relation to the space, the purpose of the youth facility and shared use by different user groups. The result was a construction plan with visualisations and dimensioned drawings for putting the construction out to tender.
SUOSIOLANTIE IN NUMBERS
drawings from pupils in grades 4–6
plans of their own from adult enthusiasts
active skateboarders in the discussion about the hall’s content
messages in the WhatsApp community discussion

Draft plans were on display for the participants, who voted on which direction the design should take.

Participatory design together: Jaakko Tossavainen presented the plan and made changes in real time according to the participants’ wishes.

Participants’ drawings on the walls.




Participants’ drawings from the design of the Suosiolantie skate hall.
NEXT STEP
You do not need a finished plan, a budget or even a final location. The job of reference planning is to work out the things the client does not yet know.